Forum Replies Created

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • in reply to: Lateral Structure in a 1D HEC-RAS Model #18190
    Mo
    Participant

    Scott,

    My tailwater connection type is out of system.

    in reply to: Drainage Ditch Bank Overtopping #18113
    Mo
    Participant

    Another follow up.

    Currently, I am terminating my XSs at the top of the ditch’s bank that is being overtopped. Should I extend my XSs beyond the top of bank or is it okay to leave them where they are and just add the lateral structure.

    in reply to: Drainage Ditch Bank Overtopping #18110
    Mo
    Participant

    Scott,

    Thank you for your response. I appreciate it.

    Mo

Viewing 3 posts - 1 through 3 (of 3 total)