Hi,
If you have a DTM in meter and a project in US System i think there is a unit conflict ?
Because when you edit your SA_Connection, you can see that the given elevation is in meter. So you will hav a SA_Connection in feet based on the terrain in meter. And RAS will consider that your elevation is in feet while it is in meter so the computed depth should be wrong ?