  • in reply to: Inline structure #12616
    Elif
    Participant

    Yes, there is a space between invert elevation of the spillway and the walkway. Actually my purpose is to confirm the sufficient clearance of the walkway over the spillway to pass storm events.
    you mean the open gate plays the role of the walkway over the weir?