I am building a linked 1D-2D unsteady flow model. When drawing the 2D flow areas (to be connected to the 1D reach with a lateral structure), I am uncertain where to place them in relation to the 1D cross sections. For instance, on the bank stations or at the end of the 1D cross sections (or in between)?
This is straightforward where there is an embankment (i.e. the 2D area can be drawn along the crest); however, this does not apply for much of my river (see XS below).
The manual states “try to find the high ground the separates the main river from the floodplain”. My feeling is to draw the 2D boundary just outside the bank stations. I’d appreciate other users’ feedback on this. Thanks!