I am modeling a creek and the 25-100 year water surface elevations are too high for the cross-sections at some points. Are there any variables that can be changed in order to reduce the water surface elevations? I understand that some cross-sections aren’t capable of taking certain flows, but I just want to make sure that I’m modeling this as accurately as possible.