When i was running the Hydraulic Design-Sediment Transport Capacity,the computation messages shows”The moveable sediment bed station is outside of the cross section at river station 012.5 in reach ShiDi Stream in river ShiDi, Review your data at this location for completeness and consistency.”
The river station 012.5 is a bridge,its upstream and downstream station are 13 and 12.1.
What is wrong with that?Can anyone help me to fix it?THANKS.