Good morning all,
I have an unusual situation that requires some assistance.
I´m trying to model a situation where I have a Storage Area between two sections and right next to it (downstream – inline structure) a Weir. In this particular Weir I made 3 culverts of diferent sizes and 1 gate. Now.. so far I think I handled quite well (I might just be wrong), but I’m having a hard time to make HEC-RAS 5.0.3 distributes the flows through this culverts, since the bigger one is supposedly going to conect with a pipe that goes to somewhere else.
Does anyone knows how to do this? Or if it is even possible?
(See images for better understanding)
Thanks for the attention!



