Welcome to the RAS Solution Forums HEC-RAS Help Stage and Flow Hydrograph Error

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #17888
    Jonathon McDonald
    Participant

    Has anyone had any issues with a Stage and Flow Hydrograph of an SA/2D Connection showing a high head and tailwater when the flow is just beginning? The stage basically peaks before the flow peaks.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.