Welcome to the RAS Solution Forums HEC-RAS Help Overbank Reach Lengths

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #5887
    Kent Lunski
    Participant

    Can someone explain the ROB and LOB input? To start with,is it the top of bank of the waterway? Should this length be revised when the floodplain and floodway are better defined? I can not find a definition and instructions to how to keep the ROB and LOB consistently defined.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.