Hello I had a question about my model. After review by the Client it has been addressed that I miscalculated the normal depth. However from reading posts from Chris Goodell I used the ground slope from my upstream reach to the control structure culverts. The reviewer said that this is incorrect and should be the slope of the energy grade line which one is correct. Also for high flows with over top does the scenario switch?