Welcome to the RAS Solution Forums HEC-RAS Help mid-channel bars

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #5939
    bonorino
    Participant

    How to deal with a mid-channel bar in HEC RAS?
    Assume the bar is completely flooded during 2-yr flood event.
    Should one increase Manning’s n to account for form roughness?
    Should one adjust the hydraulic radius to match upstream, bar-free, value?
    Thanks
    Gustavo

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.