Welcome to the RAS Solution Forums HEC-RAS Help Hec-RAS 2D Storage Area

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #7647
    [email protected]
    Participant

    Hi, I have a pretty deep channel upstream of a culvert in my model which has the storage of 35000 cubic meter. The hydrograph is low with the maximum flow of 9 cms. I was wondering why the spill happens over the culvert?

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.