Welcome to the RAS Solution › Forums › HEC-RAS Help › Hec-RAS 2D Storage Area
Hi, I have a pretty deep channel upstream of a culvert in my model which has the storage of 35000 cubic meter. The hydrograph is low with the maximum flow of 9 cms. I was wondering why the spill happens over the culvert?
Please enter an answer in digits: