Welcome to the RAS Solution Forums HECRAS Controller Get the progress status from a running model

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #8204
    Tong Zhai
    Participant

    After I call ‘Compute_CurrentPlan’, can RAS Controller retrieve the progress (like percent completion) from the running model? How?

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.