Hi
I carry out flood plain mapping of a small water shed. I am using a coupled 1D & 2D modelling approach. I have developed cross section for the channel uptill banks only. But the problem is posed for the cross section just upstream and downstream of bridges. Do i need to keep them uptill bank lines or i can extend them as i will be generating a 2D mesh for flood plain areas.
Thanks for the suggestions