Hi,
I am fairly new to HEC-RAS so I maybe making a simple mistake but any advice or help somebody could give me that would be great.
I am trying to model a fish bypass that departs from the main channel joining again 63m downstream. The channel is very small capacity (2m wide, 0.5m high) relative to the main channel
There is no control structure to the fish pass so I have included just two junctions, one at the exit from the main channel and one at the re-entry. Do I have to do anything special for the junctions?
The model will run steady and unsteady without the bypass and steady with it but immediately goes unstable when running unsteady with the bypass.
Again, any advice would be great,
Many thanks