Hello:
According to the user’s manual, version 5.0 and later, HEC-RAS should be able to model dredge events with start and end date. It also claims that the mass is removed proportional to the time steps.
1) I tried several combinations of this procedure and always end up with a one time-step dredging event. In other words, I do not see the dredging event occurring across the time interval. Has somebody been able to model dredging with Start and End Dates removing proportional mass?
2) The option Dredging Event menu have changed in several versions 5 (5.0, 5.03, 5.05). Version 5.0.5 has a button “Enter Table of Dredge Events”. Every time you hit this button and error comes “Run-time error 424: Object Required”, and the program closes. Is this a bug or there is something wrong with Windows 10?
Any recommendation is welcome.