You may need to add ineffective flow in the right overbank to keep the continuity of the flows. The conveyance capacity in the overbank increased between profiles and took some additional flow out of the channel. It really doesn’t look that bad magnitude wise. I wouldn’t consider 380 to 190 cfs of flow in the channel out of almost 3000cfs drastic. If it were going from 1000cfs to 190cfs then yes.
If you already have ineffective flow in overbank and it is overtopped this will cause this…the same if levee point overtopped. Playing around with effective flow station/elevation will fix it but in this case I doubt you’ll see a much if any difference is WSE.