Welcome to the RAS Solution › Forums › HEC-RAS Help › Dam failures in cascade using level pool option
HEC-RAS Modelers,
I setup in the past HEC-RAS 1D model of 2 dam failures in cascade using dynamic reservoir drawdown (cross-sections) or with HEC-RAS 2D.
I am having trouble setting up 2 dam failures in cascade using level pool option. Is it possible? Thank you for providing some guidance.
Nan
Please enter an answer in digits: