Welcome to the RAS Solution Forums HEC-RAS Help Culvert block when dam fail

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #7609
    Anonymous
    Guest

    Hi all, I’m trying to create a model that all the culverts is working during initial condition, but then when the dam breaks, all/part of the culverts are blocked. I couldn’t delete the culvert for the dam break situation, since the geometric data for the base condition and the break condition need to be the same. Is there anyway I can perform this? Or can I simply know the flows going through the culvert in a 2D simulation? Thank you!

Viewing 1 post (of 1 total)