Hello!
I’m working on a small river reach just 300 m long and I’m trying to connect main channel (1D) to left and right flood area (2D). I managed to connect it together, using lateral structure. The simulation seems to be stabile, but it pops this out:
Maximum 1D/2D iterations:
20SEP 12:15:17 River River 0 337
20SEP 12:15:17 River River 1 337
This message goes on for my river station 337 and 338, where is the station of my lateral structure. Can be problem for this in my lateral structure??
As I was saying, the simulation went trough. And if I look at the results in RAS MAPPER I see the water transfering from main channel to flood areas, but on some sections on the river there are gaps with no flow in it. Is this only visual problem or my water really does not flow on that areas? Because the connection between 1D/2D is ok, I can see the thick black line witch means that connection was made. Is the problem that my profiles are not in the 2D mesh area (my profiles end a little bit before the 2D mesh beggins)?
Here is the picture of that gap between main chanel and overbank, right were the lateral structre is:
Thank you