I’m modeling a bridge and trying to find what specific event the bridge is overtopped?
For example, the bridge could over top during the 112 year storm event (Q112). This event is outside of the normal intervals: Q2, Q5, Q10 ,Q25, etc..
How is this calculated using HECRAS?
Is it done using the rating curve?