It’s a bridge extension job. On upstream bridge section, Low chord for proposed condition is higher than existing condition. Bounding sections are same for both existing and proposed. Graphic seems to be correct but somehow HEC-RAS report shows existing bridge opening greater than proposed.
What could be the possible reason for that or any solution to resolve this.
thanks