  • #7430
    godzilla
    Participant

    Ver 5.0.6
    Canal reach with a concrete slab bridge spanning the top of banks. Sections above and below with differing steady flow inputs. Reviewer says discharges are different between upstream and downstream sides of structure and to revise discharges so the amount of flow entering equals the amount that exits. I don’t see where to control these discharge flows. Anyone has an answer?