  • #6028
    Danny Burkett
    Participant

    I have a number of culverts and bridges and the upstream water level from the multiple opening analysis for these is different to the upstream cross section which are generally only a few metres away. Why is this the case? It seems to me that if I use the multiple opening analysis approach, the water levels for the upstream cross-section are ‘dictated’ by the culvert that has the highest invert level (if there is flow going through it). Is this the case or why are there differences as I mentioend above

    #9775
    Anonymous
    Guest

    Not sure, here is one possibility:
    For a multiple opening, the water surface immediately upstream of each opening can vary slightly depending on the approach velocity for that opening. If it converges to a good solution, each opening should have the same energy grade line. The actual water surface is based on this energy grade minus the velocity head. The velocity head can be different for each opening.

    If the energy grade for the multiple opening in your data set is consistent, I would guess that that is what is going on. If the energy grade is not consistent, it probably didn’t converge.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.