    I setup geometry entirely as 2D. the dam to fail is modeled as SA/SD connection. I have a 30″ CMP spillway pipe as the primary. no emergency channel currently. When trying to run the “Failure case”

    error: Connections using culverts cannot be breached. Only connections with weirs and gates can be breached.

    I put in an artificial gate and it runs. How could I put in a realistic outflow hydrograph from the dam? Note: I ran the overflow computation method as “Normal 2D Equation Domain”.

    #2
    Make lake within the 2D upper reach has bottom of lake contours. in order the the pool elevation to be raised to the correct initial elevation, I had to use 2D options, and set initial time at 7 hours. that allowed the model have water stored inside the lake at the start of the run. Does that make sense? or is there a better method to flood the lake to normal pool level using only 2D terrain?