For a RAS project that only has one river/reach, you would have, at a minimum, one upstream boundary condition, and one downstream boudnary condition. The upstream is typically a flow hydrograph, but could be flow hydrograph, stage hydrograph, or stage/flow hydrograph. The downstream boundary condition could be stage hydrograph, flow hydrograph, stage/flow hydrograph, rating curve, or normal depth. Typically I see either stage hydrograph or normal depth as the downstream boundary. Sometimes a rating curve. And yes, the initial conditions is typically the first time-step flow (from your upstream boundary flow hydrograph).