Welcome to the RAS Solution Forums HEC-RAS Help 2D Pump Station. HEC-RAS 6.0 Beta 2

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #7840
    irpanch
    Participant

    Halo there,
    I try to create a pump station in 2D Mesh that connect to storage area which looks like these:

    I do have already set the inlet from mesh and outlet to storage area.
    But, when I run it, it keeps telling me that “GIS Centerline does not start with the inlet in 2d flow area..”.
    I try to create a GIS centerline with a lot of scenarios (inside the mesh, outside mesh) but the result is still the same, it won’t run with the same message. I can’t find the “inlet” in 2d flow area.

    I do read the manual and seems there’s nothing extraordinary to connect the pump between mesh to SA.

    I wonder if there are any additional things to do to create a connection between them?
    Thanks in advance.


Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.