Hello,
I have some problems with culverts in 2D model. I wanted to introduce a bridge as a SA/2D Area connection with 4 openings, it runs perfect, but when I see the results it has a big increase of the water level upstream the structure. I did the same with a 1D model everything the same… I know it would be different results, but not so big difference
In the next image you can see the water level on the 2D and 1D models, and the difference between them is like 2-3 meters…
I will try to calibrate changing the weir coefficient…but is someone have another idea?
Thanks